We have discovered that the actual building will be on a split level, the large community centre will be in the front and behind that, at a lower level, will be the kitchen, dining, toilets and storage areas.
This first shot was taken on Wednesday 6th August.
And these last three photos were taken on Sunday 10th August. The third shot shows the two levels as well as the height above the new retaining wall.
The ‘site committee’, which includes Fr. Kevin McDonagh and Marion, seem quite satisfied with what has happened so far!